Skip to content
Control Mix ExpressControl Mix Express

How the Sistema Control Mix® works

A six-stage quality cycle that ensures reliable results for the concrete specimens taken at your site. Designed and implemented in Peru, using the ASTM standards required by NTE E.060 Reinforced Concrete.

The only lab accredited across all its processes.

From sampling on site to the test report, the whole Sistema Control Mix® works under INACAL accreditation (NTP-ISO/IEC 17025, registration LE-168) and an ISO 9001:2015 certified management system.

ISO 9001 SGS

ISO 9001:2015

Management system certified by SGS

INACAL DA-Perú, Laboratorio de Ensayo Acreditado, Registro N° LE-168

Accredited by INACAL

Registration No. LE-168 · NTP-ISO/IEC 17025

Accredited by INACAL · LE-168

INACAL accreditation certificate granted to Control Mix Express S.A.C.

Why six stages?

A compression test is only as reliable as the specimen being tested. If sampling, transport or curing fail, the result drops even when the concrete is good. The system controls every step with certified staff, our own equipment and standardized procedures.

Simulate a specimen's journey

Follow one cylinder from the pour to the report. Then switch to “No control” and see how good concrete can produce a low result.

View
TheoryPracticeExamCME certified

Stage 1 of 6

With the CME System

Training and certification

0:00 / 0:36

Status

Certified technician

LA-0352

—

Stage 1

Training and certification

We train and certify the crew at your site who sample and cast specimens, based on the ACI Concrete Field Testing Technician Grade I program. It includes theory, hands-on practice and an exam.

ACI Grade I · NTE E.060

Same concrete, same f'c 280 kg/cm². The only difference is how the specimen was handled.

Illustrative simulation with example values.

What your project gets

  • Your own crew trained and certified to sample
  • Modules with molds for every pour
  • Daily specimen pickup
  • Test certificates online and by email
  • Control Data® statistics for the whole project
  • Quality dossier at closeout

Technical documents

Frequently asked questions

Who casts the specimens on site?

Your own crew, after CME trains and certifies them. That way sampling happens right at the pour, without waiting for an outside technician.

How many specimens does each module hold?

Six 4" × 8" molds: usually 3 are tested at early age and 3 at 28 days.

When do I get the results?

As soon as the break is done. The certificate is generated automatically and sent to your project's registered emails.

What if a result comes out low?

We help you interpret it and, if needed, offer core drilling and testing, rebound hammer testing and rebar location to assess the structure.

Get a quote for your project's quality control.

Tell us about your project and we'll send you a proposal. Or message us on WhatsApp or give us a call.